The Short Answer
Homes at Promenade Bay are bought before completion, so the price is paid in stages under the standard progressive payment scheme for uncompleted private homes. Buyers pay 20% within eight weeks of the option to purchase, a further 40% across six construction stages, then 25% when the Temporary Occupation Permit is issued and the final 15% at the Certificate of Statutory Completion. The payment schemes offered for Promenade Bay accompany the price list.
The Stages
| Stage | Share of price |
|---|---|
| Option to purchase | 5% |
| Sale and purchase agreement (within 8 weeks) | 15% |
| Foundation | 10% |
| Reinforced concrete framework | 10% |
| Partition walls | 5% |
| Roof and ceiling | 5% |
| Doors, windows, wiring and plumbing | 5% |
| Car park, roads and drains | 5% |
| Temporary Occupation Permit | 25% |
| Certificate of Statutory Completion | 15% |
This is the standard schedule under the Housing Developers Rules; the Promenade Bay sale and purchase agreement holds the binding terms.
The Downpayment
The first 20% comes from cash and CPF Ordinary Account savings. With a first housing loan at the full 75%, MAS asks for a cash minimum of 5% of the price; the remaining 15% of the downpayment can be met from CPF savings, cash or a mix. Where the loan tenure runs beyond 30 years or past the borrower’s 65th birthday, the limit falls to 55% and the cash minimum rises to 10%; on a second or later housing loan, the cash minimum is 25%.
How the Loan Is Drawn
The bank lends only as each stage is certified, so interest is charged on the amount drawn so far. With a 75% loan, the buyer’s own funds cover the first 25%, and the bank’s first release is the 5% above that line at the foundation stage. Monthly repayments start small and grow with each release, reaching their full level after the final stage.
CPF and the 99-Year Lease
Promenade Bay stands on a fresh 99-year lease. Full use of Ordinary Account savings is allowed when the remaining lease outlasts the youngest buyer’s 95th birthday, a test a fresh 99-year lease passes easily for working-age buyers;; CPF Board confirms the usable amount for each household at purchase. Rates and rules in this article were checked on 25 November 2026.
An Example on an Illustrative Price
| Part of the price | Share | On S$2,000,000 |
|---|---|---|
| Downpayment (option and agreement) | 20% | S$400,000 |
| Six construction stages | 40% | S$800,000 |
| Temporary Occupation Permit | 25% | S$500,000 |
| Certificate of Statutory Completion | 15% | S$300,000 |
S$2,000,000 is a round illustrative figure with no connection to any Promenade Bay price; it simply shows how the shares translate into amounts. With a 75% loan, the buyer’s own funds cover the first S$500,000, made up of the S$400,000 downpayment and the first S$100,000 of the foundation stage, before the bank starts releasing the loan.
Stamp Duty Alongside
Stamp duty is paid within 14 days of signing the agreement, at the same point as the second part of the downpayment. On the same illustrative S$2,000,000, Buyer’s Stamp Duty is S$69,600, with any Additional Buyer’s Stamp Duty added for the buyer’s profile. The stamp duty article works through the rates in full.
Temporary Occupation Permit and Statutory Completion
The two closing stages are the largest. The Temporary Occupation Permit is issued when the building is ready to be occupied, and 25% of the price falls due then; this is also when keys are typically handed over. The Certificate of Statutory Completion follows once every statutory requirement has been met, and the final 15% is paid at that point. Between them, these two stages account for 40% of the price.
Loan Tenure and the Bands
The tenure chosen affects more than the monthly repayment. Stretch a first housing loan past 30 years, or past the point where the borrower turns 65, and the ceiling drops from 75% of the price to 55%, while the cash part of the downpayment doubles from 5% to 10%. The housing loan information page sets out every band, and the calculator applies them automatically.
Where the Schedule Comes From
The stages and percentages above are set by the Housing Developers Rules, which govern the sale of uncompleted private homes in Singapore, and every developer selling under the standard scheme follows them. The binding schedule for each home is the one in its sale and purchase agreement, and the Promenade Bay payment schemes accompany the price list, which the Sales Concierge sends to registered buyers on release.
Using CPF at Later Stages
Ordinary Account savings are not limited to the downpayment. Within the limits CPF Board sets, they can also meet later progressive payments alongside the bank loan, which lets some households keep more cash in reserve during construction.
Seeing the Numbers
The progressive payment calculator shows every release and the repayment after it for any price, tenure and rate, and the payment scheme page explains each stage. The TDSR calculator checks that the loan fits the household’s income.
General background written in November 2026; it is not financial, legal or tax advice. Duty and loan figures match the financing pages of this website, and distances are straight lines measured from the Kallang Close site.